FW: Schedules for HVAC systems

1 post / 0 new

I generate copies in Wizard, assign them to the correct shell, then move
to detailed and cannot see correct schedules (I mean cooling/heating
day) or I cannot see them at all for a copied systems in detailed mode.
I found it by accident when I started to do DR measures. Then I decided
to run a test just for a simple 2-story building served by two different
systems on each floor. Exactly the same thing happened. When I created
the 2nd system from a scratch, everything worked fine; then I tried to
generate a second one as a copy of existing one, the software did not
work correctly and you can see it only later if you will move to
detailed mode.