CHW loop operation schedule

1 post / 0 new

Dear All

I am working on a project in which one AHU has small load and we want to
switch chilled water loop based on ON/OFF schedule.
In day time AHU is serving with "CHW-1 loop" and in night time it is
serving with "CHW-2 loop".

Is it possible in eQUEST to switch chilled water loop based on schedule or
using IF-THAN schedule.

--
With Thanks and Regards,
Praveen K. Jain

Praveen Jain's picture
Offline
Joined: 2011-09-30
Reputation: 0