Hi All,
I used equipment control to give priority to my 250 TR water
cooled chiller first and 250 TR air cooled second . through load1 and
Load2.
Now should i set load management also where it asks for equipment
control type 1,2 etc or leave it till equipment control.
Thanks
Sambhav