Chiller Priority

1 post / 0 new

Hi All,
I used equipment control to give priority to my 250 TR water
cooled chiller first and 250 TR air cooled second . through load1 and
Load2.

Now should i set load management also where it asks for equipment
control type 1,2 etc or leave it till equipment control.

Thanks
Sambhav

sambhav tiwari's picture
Offline
Joined: 2011-09-30
Reputation: 0