Base Line Ventilation increased

1 post / 0 new

Hi guys,

After a finished the proposed model for the building with a VAV parallel
fan box system I ran the simulation for the ASHRAE 90.1 baseline model
using parametric run. I noticed an increase in the ventilation fan power
consumption and increase in the unmet hours by 150 hour. Is there a
solution for that?

Thank you,
Saif,

via Equest-users's picture
Joined: 2016-07-15
Reputation: 400