Condenser Lockout Schedule

1 post / 0 new

I am attempting to create a schedule that will "lock-out" condensers
based on windows opening. I've specified the Sherman-Grimsrud Method and
have worked out natural ventilation schedules and probability, but when
I assign an operation schedule to condenser cooling eQuest crashes.

Any help would be much appreciated.

Happy Holidays.

Matthew Higgins, LEED AP + ASHRAE-HPBD

Matthew Higgins's picture
Offline
Joined: 2011-09-30
Reputation: 0