*Hello, I have a project that has 3 chillers in a primary loop and two
secondary loops.*
*
*
*Secondary loop 01 serves multiple Fan-coil equipments.*
*Secondary loop 02 serves a packaged air handling unit that supply
pre-cooled air to the Fan-coil units in Secondary loop 01.*
*
*
*Is there a LEED accepted methology or anyway to model and documet this
succesfully? *
*Thank you all*
*Arq. Agust?n Cortina*