Hi all,
I've got two beginner's questions:
Is it correct to use a "Air cooled, with condenser, electrically
operated" (Table 6.8.1C) when looking for the water chilling package
of a baseline system 6 "Packaged VAV with PFP boxes (Direct expansion
+ Electric resistance)" ?
What is "Air cooled, without condenser, electrically operated" also
on table 6.8.1C supposed to mean? How is the water going to be chilled
if there is no condenser?
Thanks in advace,
Dionisio Franca
LEED AP+OM