SubMeters in Equest

2 posts / 0 new
Last post

Equest users,
In order to isolate my elevator energy usage for a LEED model, I created a submeter of type electric and assigned the elevator loads to it. I then assigned that submeter to the main electric meter. This seems to have worked just fine. My question then is this: Which report details the energy consumption of my submeter. I looked at the BEPS and BEPU reports, but they have the total electric usage listed without my submeter broken out. Am I looking at the right report? Thanks

Seun Odukomaiya, LEED AP

Seun Odukomaiya2's picture
Joined: 2011-09-30
Reputation: 0

Report PS-B, Utility and Fuel Use Summary

Kimberly Killian

Original message
From: "Seun Odukomaiya"
To: equest-users at lists.onebuilding.org
Received: 3/31/2010 9:15:06 AM
Subject: [Equest-users] SubMeters in Equest

Equest users,
In order to isolate my elevator energy usage for a LEED model, I created a submeter of type electric and assigned the elevator loads to it. I then assigned that submeter to the main electric meter. This seems to have worked just fine. My question then is this: Which report details the energy consumption of my submeter. I looked at the BEPS and BEPU reports, but they have the total electric usage listed without my submeter broken out. Am I looking at the right report? Thanks

Seun Odukomaiya, LEED AP

Kimberly Killian's picture
Joined: 2011-09-30
Reputation: 0