VisualDOE unmet load hours

2 posts / 0 new
Last post

I?m trying to find the unmet load hours for the purposes of a LEED EAc1 template.

I can get them on a room-by-room basis from the Simulation > Diagnostic tab ? is there a summary of the total heating and cooling in the reports we can point to for documentation purposes?

Thanks kindly,

Christopher F. Zabaneh

Christopher Zabaneh's picture
Joined: 2011-10-02
Reputation: 0

Hello Christopher,

Look in the SS-F or SS-R reports for each zone in the output/simulation
file and that will show the hours the heating or cooling loads are
underserved.

Rob Salcido

11:52 AM >>>

I?m trying to find the unmet load hours for the purposes of a LEED EAc1
template.

I can get them on a room-by-room basis from the Simulation > Diagnostic
tab ? is there a summary of the total heating and cooling in the reports
we can point to for documentation purposes?

Thanks kindly,

Christopher F. Zabaneh

Rob Salcido's picture
Offline
Joined: 2011-10-02
Reputation: 0