Dear all,
I still couldn't finish my model.
I put zone heat source as electric.
Try different zone entering max supply temp, hot deck max leaving temp, and reheat delta t.
I put my exact heating capacity base on my VAV schedule under heating capacity for each zone.
But nothing works.
I can control unmet hours but I have got almost 850 warning error like:
Zone: Reception-A117 could not successfully
allocate all equipment energy to the 5-minute bins
because of an equipment overload. The peak load
used in ECONOMICS will not include the fraction due
to the overload, but the PLANT reports will.
Mon/Day/Hour: 1 3 7 Energy: 1.3 Unallocated: 0.065
I really need to finish this model soon.
Thank you for your help
Arash Pasgar
Can't help much without .inp files in addition to .pd2
The files are attached.
Thank you again
Arash Pasgar