Modeling ASHRAE Baseline Glass with IES <VE>

2 posts / 0 new
Last post

Has anyone modeled a baseline building in Dubai for LEED, complying with
ASHRAE 90.1? I'm wondering how to match the glazing properties. ASHRAE
lists a SHGC and a U-value, but IES asks for transmittance, reflectances,
and the refractive index.

What is the best way to model glazing to meet the ASHRAE requirements?

James Dudt, EIT, LEED AP

James.Dudt at burthill.com's picture
Joined: 2011-10-02
Reputation: 0

An HTML attachment was scrubbed...
URL:

Paul Carey's picture
Offline
Joined: 2011-10-02
Reputation: 0