Metering energy sources

3 posts / 0 new
Last post

Hello all,

I am performing an energy model on a central energy plant in Florida and
this is the situation. I have modeled it for one chiller, pump, and
cooling tower but actually it has 3 primary CHW pumps, 2 secondary, 3
cooling towers, and 3 chillers. I have one AHU and two FCU's all three
have electric reheat and on the chilled water loop. I have an already
calculated process load of the building by the electrical engineer so
therefore I don't want to account for the same process loads more than
once. I've have metered the building as EM1 and the chiller, pump, and
cooling tower as EM2. I'm stumbling on how to run the process load of
EM2 without having count towards the total energy consumption. ASHRAE
90.1 states that 25% of the buildings process load has to be used in the
proposed design and I'm trying to account for that. I ran a simulation
and it attached for anyone's viewing pleasure. I'm trying to lower the
space cooling, ventilation fans, and pumps &aux and to eliminate the
heat rejection from the cooling tower(s). If anyone could give some
advice I would greatly appreciate it. Thanks.

Christopher Sturdivant

Christopher Sturdivant2's picture
Joined: 2011-10-02
Reputation: 0

I am modeling a data center which consists of 5 attached buildings. There is
one central chiller plant and all AHUs, CRACs are cooling only (w/ chilled
water coils).

Central plant has 4 centrifugal and 3 direct fired absorption chillers. I
completed the model with DD wizard. But I can't define the base case chiller
run logic into the model. Building operators run absorption chillers during
the summer peak periods and doesn't let more than two electric chillers to
come online. They don't run the absorption chillers outside the summer
months. e-Quest is running absorption chillers all the time.

How can I enter the base case chiller run schedule into the model.

Thank you in advance for your help.

Mark Ertas PE, CEM

Mark Ertas2's picture
Offline
Joined: 2011-10-02
Reputation: 0

You will now enter the magical world of Detailed Interface, never to
return....

Without taking the time to spell it all out (see DOE-2 Help in the
eQuest Toolbar), you use EQUIP-CTRL to develop different sequences of
chillers (gas or electric in any order or bunches you choose), and
LOAD-MANAGEMENT to tell eQuest what times of the year to run each
sequence.

John R. Aulbach, PE, CEM