LEED v4 and process loads - commercial kitchens

2 posts / 0 new
Last post

I have an office building project with a large commercial kitchen. I am looking for guidance on modeling the energy consumption and the heat gains/losses.

All the kitchen equipment cut sheets have been provided so I know the peak loads but I am not sure of how to construct operating schedules for the times of peak loads and the times of idling for the equipment.

Then I have to use the LEED v4 Appendix 3 to determine the baseline peak and idle rates.

Can anyone point to studies of actual commercial kitchen energy use? Does anyone have some general rules of thumb for modeling this kind of issue?

As always, thanks for your insights.

Christopher Jones, P.Eng.
Tel: 416.644.4226 ? Toll Free: 1.888.425.7255 x 527

______________________________________________________________________
NOTICE: This communication and any attachments ("this message") may contain confidential information for the sole use of the intended recipient(s). Any unauthorized use, disclosure, viewing, copying, alteration, dissemination or distribution of, or reliance on this message is strictly prohibited. If you have received this message in error, or you are not an authorized recipient, please notify the sender immediately by replying to this message, delete this message and all copies from your e-mail system and destroy any printed copies.

Chris Jones
crollinjones's picture
Offline
Joined: 2013-12-12
Reputation: 0

The COMNET Commercial Energy Modeling Guidelines and Procedures and the
ASHRAE Handbook of Fundamentals should provide you with the information you
are looking for.

--
M. Dennis Knight, P.E., FASHRAE
Founder & CEO
*W*hole *B*uilding *S*ystems, LLC
P.O. Box 1845
Mt. Pleasant, SC 29465
Phone: 843-437-3647
Email: dknight at wholebuildingsystems.com
Website: www.wholebuildingsystems.com

Dennis Knight's picture
Offline
Joined: 2012-11-12
Reputation: 0