We are modeling a 17 story office building in Tokyo that draws power from a
district plant and have basic questions about setting up per the attached
screenshots. We would also find direction to a guidance for entering custom
rate schedules for fuel costs useful.

many thanks - j

--
James Weiner, AIA

Jim Weiner's picture
Offline
Joined: 2011-09-30
Reputation: 0

I typically do this in the detailed interface. What you need to do is
set up a chilled water and steam meter with a respective utility rate
for each of them. In the water side tab you will need to assign the
chilled water meter to the chilled water loop, and the steam/ hot water
meter to the hot water loop.

For the water heater question - I assume you will want to select the
electric option in the heater type.

Hope this helps

Vikram Sami, LEED AP

Vikram Sami's picture
Offline
Joined: 2011-09-30
Reputation: 0

An HTML attachment was scrubbed...
URL:

Scott Criswell's picture
Offline
Joined: 2011-09-30
Reputation: 0