hoping the visuals work for this...
We are modeling a 17 story office building in Tokyo that draws power from a
district plant and have basic questions about setting up per the attached
screenshots. We would also find direction to a guidance for entering custom
rate schedules for fuel costs useful.
many thanks - j
--
James Weiner, AIA
I typically do this in the detailed interface. What you need to do is
set up a chilled water and steam meter with a respective utility rate
for each of them. In the water side tab you will need to assign the
chilled water meter to the chilled water loop, and the steam/ hot water
meter to the hot water loop.
For the water heater question - I assume you will want to select the
electric option in the heater type.
Hope this helps
Vikram Sami, LEED AP
An HTML attachment was scrubbed...
URL: