eQuest LPD input output disagree

4 posts / 0 new
Last post

Dear all:

I'm modeling a 700000 sqft warehouse, everything works fine, except in BEPU
report it shows a 360.310 KWH /SQFT-YR GROSS-AREA, which doesn't make any
sense. The utility rates are correct, under Quality control reports, it
indicates errors of the peak lighting load of 67.74 w/sqft and peak
miscellaneous equipment load of 40.91 w/sqft. I did input LPD and EPD with
around 0.6 w/sqft and 0.5 w/sqft, the corresponding schedules are correct,
the building area in each floor and each zone are correct, the total energy
demand looks about right for the size of building.

But at some point the model makes the LPD output 100 times bigger than what
I input, I would appreciate it if you could provide me with any advices,
thanks!

Qing

Dale elegant's picture
Offline
Joined: 2015-05-06
Reputation: 0

The EUI figures reported on BEPU use the building area entered in the
following location (if entered). You might check here first to see if it
reads 700,000 or something else:

*NICK CATON, P.E.*
*Owner*

*Caton Energy Consulting*
1150 N. 192nd St., #4-202

Shoreline, WA 98133
office: 785.410.3317

www.catonenergy.com

*From:* Equest-users [mailto:equest-users-bounces at lists.onebuilding.org] *On
Behalf Of *Dale elegant
*Sent:* Wednesday, May 06, 2015 10:49 AM
*To:* equest-users at lists.onebuilding.org
*Subject:* [Equest-users] eQuest LPD input output disagree

Dear all:

I'm modeling a 700000 sqft warehouse, everything works fine, except in BEPU
report it shows a 360.310 KWH /SQFT-YR GROSS-AREA, which doesn't make any
sense. The utility rates are correct, under Quality control reports, it
indicates errors of the peak lighting load of 67.74 w/sqft and peak
miscellaneous equipment load of 40.91 w/sqft. I did input LPD and EPD with
around 0.6 w/sqft and 0.5 w/sqft, the corresponding schedules are correct,
the building area in each floor and each zone are correct, the total energy
demand looks about right for the size of building.

But at some point the model makes the LPD output 100 times bigger than what
I input, I would appreciate it if you could provide me with any advices,
thanks!

Qing

Nicholas Caton's picture
Offline
Joined: 2014-12-09
Reputation: 0

Dale,

Curious. Could you attach your inp file?

Vikram Sami
AIA, BEMP, LEED BD+C
Associate Partner

ZGF ARCHITECTS LLP
T 206.521.3509 E vikram.sami at zgf.com
925 Fourth Avenue, Suite 2400
Seattle, WA 98104

vsami's picture
Offline
Joined: 2013-05-31
Reputation: 1

zgfDisclaimer

Hey Vikram,

Qing Dale replied off-list that his issue is resolved. For his 700,000 ft2
project, only a small fraction was conditioned and therefore used for EUI
reporting. I suspect among other possible solutions, he could have used
the input I suggested below to override the area used in determining
reported EUI metrics.

~Nick

*NICK CATON, P.E.*
*Owner*

*Caton Energy Consulting*
1150 N. 192nd St., #4-202

Shoreline, WA 98133
office: 785.410.3317

www.catonenergy.com

*From:* Sami, Vikram [mailto:vikram.sami at zgf.com]
*Sent:* Thursday, May 07, 2015 9:39 AM
*To:* Nicholas Caton; Dale elegant; equest-users at lists.onebuilding.org
*Subject:* RE: [Equest-users] eQuest LPD input output disagree

Dale,

Curious. Could you attach your inp file?

*Vikram Sami*
AIA, BEMP, LEED BD+C
Associate Partner

ZGF ARCHITECTS LLP
*T *206.521.3509 *E *vikram.sami at zgf.com
925 Fourth Avenue, Suite 2400
Seattle, WA 98104

*From:* Equest-users [mailto:equest-users-bounces at lists.onebuilding.org
] *On Behalf Of *Nicholas Caton
*Sent:* Wednesday, May 06, 2015 1:51 PM
*To:* Dale elegant; equest-users at lists.onebuilding.org
*Subject:* Re: [Equest-users] eQuest LPD input output disagree

The EUI figures reported on BEPU use the building area entered in the
following location (if entered). You might check here first to see if it
reads 700,000 or something else:

*NICK CATON, P.E.*
*Owner*

*Caton Energy Consulting*
1150 N. 192nd St., #4-202

Shoreline, WA 98133
office: 785.410.3317

www.catonenergy.com

*From:* Equest-users [mailto:equest-users-bounces at lists.onebuilding.org] *On
Behalf Of *Dale elegant
*Sent:* Wednesday, May 06, 2015 10:49 AM
*To:* equest-users at lists.onebuilding.org
*Subject:* [Equest-users] eQuest LPD input output disagree

Dear all:

I'm modeling a 700000 sqft warehouse, everything works fine, except in BEPU
report it shows a 360.310 KWH /SQFT-YR GROSS-AREA, which doesn't make any
sense. The utility rates are correct, under Quality control reports, it
indicates errors of the peak lighting load of 67.74 w/sqft and peak
miscellaneous equipment load of 40.91 w/sqft. I did input LPD and EPD with
around 0.6 w/sqft and 0.5 w/sqft, the corresponding schedules are correct,
the building area in each floor and each zone are correct, the total energy
demand looks about right for the size of building.

But at some point the model makes the LPD output 100 times bigger than what
I input, I would appreciate it if you could provide me with any advices,
thanks!

Qing