Hello everyone,
I am modeling a system 8 for a LEED baseline and I'm having an interesting issue over here. The system is a VAV with PFP boxes, with one system per floor and a central chiller plant.
Now, the LEED reviewers are saying that the IT rooms should be modeled with a system 4 which sounds reasonable since the chiller should not be working on unoccupied hours just for this small room. When I make the change in eQuest, by setting an independent system for this zone, the total pump and cooling energy consumption drops significantly, which doesn't make any sense if the room is just about 1 ton in a 3000 ton system.
Has anyone had a similar issue?
Thank you!

Ing. Gast?n Michaud F.
Tel.: (506) 2222-7529
Fax: (506) 2256-5608
From USA: 1-305-433-3668
Calle 30, Avenida 0 y 2. San Jos?, Costa Rica

[Description: Description: Description: Description: Description: LEEDAP_BDCbw] [cid:image002.jpg at 01CF4517.8D2BB550]

[Description: Logo CTS firma]
Este correo puede contener informaci?n protegida por el secreto profesional. Si usted no es la persona a quien va dirigido, por favor tome en cuenta que su divulgaci?n, distribuci?n o reproducci?n es estrictamente prohibida. Cualquier persona que reciba este mensaje por error debe notificarlo inmediatamente al remitente v?a telef?nica o correo electr?nico y borrarlo permanentemente de su computador. Los comentarios plasmados en este correo son del remitente solamente y no reflejan necesariamente la posici?n de CTS S.A.
Por favor considere su responsabilidad con el medio ambiente antes de imprimir este correo electr?nico
----------------------------------------------------------------------------------------------------------------
This mail may contain information that is legally privileged, confidential or exempt from disclosure. If you are not the intended recipient, please note that any dissemination, distribution or copying of this message is strictly prohibited. Anyone who receives this message in error should notify the sender immediately by telephone or by e-mail and delete it permanently from their computer. The opinions above are those of the author and do not necessarily reflect the position of CTS S.A.
Please consider your environmental responsibility before printing this e-mail

Gastón Michaud Fernández's picture
Joined: 2012-11-26
Reputation: 0

Is it possible that the IT room was making the pumping/CHW system run
extra hours on nights and weekends.
Check the operating hours in PS-C command for the loop and pumps.

Thanks
Rishabh

rishabh kasliwal's picture
Joined: 2011-09-30
Reputation: 0

Did you set your Chilled Water loop to run initially on Demand rather than Standby? Standby will run the pumps continuously, Demand only operates when there is a load.

John R. Aulbach, PE

Is it possible that the IT room was making the pumping/CHW system run extra hours on nights and weekends.
Check the operating hours in PS-C command for the loop and pumps.

Thanks
Rishabh

John Aulbach's picture
Offline
Joined: 2011-09-30