Baseboard Schedules

3 posts / 0 new
Last post

Hi,

I am having trouble assigning a baseboard schedule in the detailed
interface. Whenever I create one and then try and select it in the
baseboard properties tab it comes up with the following error.

The type of schedule I had selected was the On/Off Temp and then I tried
just On/Off. Does anyone know what type a baseboard schedule should be
if both of these are incompatible?

Thanks in advance for your help.

Best Regards,

Celia King-Scott
LEED(r) AP

King-Scott, Celia's picture
Joined: 2011-09-30
Reputation: 0

Sorry the error didn't appear in my previous post..

Hi,

I am having trouble assigning a baseboard schedule in the detailed
interface. Whenever I create one and then try and select it in the
baseboard properties tab it comes up with the following error.

'The data just modified will cause the following 1 error (s):
HVAC System 'EL1 Sys1(PTAC) (G.1) 'BASEBOARD-SCH: Assigned building
component "Annual Schedule 16' is of an incompatible type'

The type of schedule I had selected was the On/Off Temp and then I tried
just On/Off. Does anyone know what type a baseboard schedule should be
if both of these are incompatible?

Thanks in advance for your help.

Best Regards,

Celia King-Scott

King-Scott, Celia's picture
Joined: 2011-09-30
Reputation: 0

Celia,

You need to use a schedule type of RESET-RATIO. You can get more info by
right-clicking in the field to get Item Help.

Regards,

William Bishop, EIT, LEED(r) AP

Bishop, Bill2's picture
Offline
Joined: 2011-09-30
Reputation: 0